+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445

Choosing NOC Confused.

james_tvm

Star Member
Feb 17, 2011
186
10
Trivandrum, India
Category........
PNP
Visa Office......
New Delhi
NOC Code......
70010
App. Filed.......
16-10-2023
Doc's Request.
NA
Nomination.....
06-06-2024
AOR Received.
Waiting
Dear all senior members,

Please shed some light.

0711 - construction managers
2131 - Civil engineer
2231 - civil engineer technologists & technicians

I need a help in choosing the correct NOC for my job duties performed. Its getting confused between 03 NOC codes likely 0711, 2131, 2231.

Basically, am a civil engineer from construction planning background with 5.5 years experience & most of the job responsibilities matches with the NOC code 0711 of construction managers(65%) items 6/9, but I don't have any managerial roles performed during these years. Also, in mine, all documents the designation is written as the civil engineer only.

In case of 2131 out of 14 responsibilities matching only 03, otherwise I want to tailor the letter to match the NOC job responsibilities.


In case of 2231 out of 5 responsibilities matching only 03, here too I want to tailor the letter to match the NOC job responsibilities.

Please help me out in choosing the correct NOC.

Thanks well in advance.
 

jackdawn

Champion Member
Dec 24, 2016
1,295
920
Dear all senior members,

Please shed some light.

0711 - construction managers
2131 - Civil engineer
2231 - civil engineer technologists & technicians

I need a help in choosing the correct NOC for my job duties performed. Its getting confused between 03 NOC codes likely 0711, 2131, 2231.

Basically, am a civil engineer from construction planning background with 5.5 years experience & most of the job responsibilities matches with the NOC code 0711 of construction managers(65%) items 6/9, but I don't have any managerial roles performed during these years. Also, in mine, all documents the designation is written as the civil engineer only.

In case of 2131 out of 14 responsibilities matching only 03, otherwise I want to tailor the letter to match the NOC job responsibilities.


In case of 2231 out of 5 responsibilities matching only 03, here too I want to tailor the letter to match the NOC job responsibilities.

Please help me out in choosing the correct NOC.

Thanks well in advance.
Well u are the right person to decide which NOC suits you. Nevertheless one thing which can make ur job easy in selecting the NOC is the reference letter. The reference letter which u get from your employer should have details of ur job roles and responsibilities and should match at least 70-80% of the NOC roles.
 

agil.itu

Full Member
Sep 20, 2016
22
1
Dear all senior members,

Please shed some light.

0711 - construction managers
2131 - Civil engineer
2231 - civil engineer technologists & technicians

I need a help in choosing the correct NOC for my job duties performed. Its getting confused between 03 NOC codes likely 0711, 2131, 2231.

Basically, am a civil engineer from construction planning background with 5.5 years experience & most of the job responsibilities matches with the NOC code 0711 of construction managers(65%) items 6/9, but I don't have any managerial roles performed during these years. Also, in mine, all documents the designation is written as the civil engineer only.

In case of 2131 out of 14 responsibilities matching only 03, otherwise I want to tailor the letter to match the NOC job responsibilities.


In case of 2231 out of 5 responsibilities matching only 03, here too I want to tailor the letter to match the NOC job responsibilities.

Please help me out in choosing the correct NOC.

Thanks well in advance.
Dear james_tvm,

I'm in similar situation with you, as I'm a project engineer working in oil company for flowline projects. My current duties match with 0711 of construction manager however my role is not a managerial job. I would be very grateful if you can share your own experience.
Thanks in Advance
 

james_tvm

Star Member
Feb 17, 2011
186
10
Trivandrum, India
Category........
PNP
Visa Office......
New Delhi
NOC Code......
70010
App. Filed.......
16-10-2023
Doc's Request.
NA
Nomination.....
06-06-2024
AOR Received.
Waiting
Dear james_tvm,

I'm in similar situation with you, as I'm a project engineer working in oil company for flowline projects. My current duties match with 0711 of construction manager however my role is not a managerial job. I would be very grateful if you can share your own experience.
Thanks in Advance

Dear Agil..

Am still in the process only...So better to write down ur job responsibilities & match them with the perfect NOC for at least 60-70%...
 

agil.itu

Full Member
Sep 20, 2016
22
1
Dear James,
There is a zero opportunity to changes the current duties,
Those are current duties:

HSSE
• Ensure health, safety and environment issues have been addressed for the projects he is responsible through the project life cycle.

Project Delivery
• Accountable to support Project Manager for delivery of flowlines and associated projects safely, on budget, on schedule and on quality
• Develop relationships and communication pathways needed and manage his responsibilities with key Stakeholders
• Support project plans and risk mitigation for flowlines
• Represent Project Manamer in the Activity Planning meetings to communicate the progress and action updates
• Support a smooth handover from Execute to Operate stage

Contractors Management
• Support Project Manager to provide technical oversight of contractor engineering and processes i.e. represent Project Manager in project kick-off and Installation ready meetings , support raising Non-Conformance reports
• Support Flowlines PM to provide commercial oversight of contractor spends and supply chain i.e. initial screening of the Project Change Notice as per baselines and make recommendations, review the initial cost phasing

Performance Management
• Support and validate frequent reporting and analysis of project performance indicators to achieve safe, reliable and compliant operations.
• Support Flowlines Project Manager on decision making by ensuring timely and consistent communication to stakeholders on progress, changes, and impact on portfolio components
 

richi93

Star Member
Mar 28, 2018
63
14
chandigarh
NOC Code......
0711
Dear All,

I am working as a Planning Engineer since last 4 years . does NOC-0711 suits best for me?.
Also I have a express entry profile with CRS -393.
Can I opt for any PNP .
I have appeared for IELTS twice and got the result - L -8.5/ R-8/S-7.5/W-6.5
Would I have to change my NOC to 2131?
I have also prepared a letter of reference for 2 years from my previous employer.
I would like to share that and take your reviews on that
 

psy347

Full Member
Aug 6, 2018
47
5
Dear all senior members,

Please shed some light.

0711 - construction managers
2131 - Civil engineer
2231 - civil engineer technologists & technicians

I need a help in choosing the correct NOC for my job duties performed. Its getting confused between 03 NOC codes likely 0711, 2131, 2231.

Basically, am a civil engineer from construction planning background with 5.5 years experience & most of the job responsibilities matches with the NOC code 0711 of construction managers(65%) items 6/9, but I don't have any managerial roles performed during these years. Also, in mine, all documents the designation is written as the civil engineer only.

In case of 2131 out of 14 responsibilities matching only 03, otherwise I want to tailor the letter to match the NOC job responsibilities.


In case of 2231 out of 5 responsibilities matching only 03, here too I want to tailor the letter to match the NOC job responsibilities.

Please help me out in choosing the correct NOC.

Thanks well in advance.
Can you tell a bit more about your educational background and exact nature of your work. Because based on that a suitable NOC could be suggested for CIC fit.
 
Last edited:

stefenjohn

Newbie
Mar 29, 2018
2
0
Category........
FSW
NOC Code......
2132
Pre-Assessed..
Yes
Dear All,

My name is Steve. I studied mechanical engineering and currently working in saudi as planning Engineer. Now My migration agent told me that my NOC is 0711 Construction Manager. But I am not performing any managerial role in my company. So can I go ahead with Construction manager NOC - 0711. Is there any chances for PNP Nomination for this NOC. Please help me.

NOC 0711 Duties as per NOC list

1) Plan, organize, direct, control and evaluate construction projects from start to finish according to schedule, specifications and budget- Doing
2) Prepare and submit construction project budget estimates- Not Doing
3) Plan and prepare construction schedules and milestones and monitor progress against established schedules- Doing
4) Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors- Not Doing
5) Develop and implement quality control programs- Not Doing
6) Represent company on matters such as business services and union contracts negotiation- Doing
7) Prepare progress reports and issue progress schedules to clients - Doing
8) Direct the purchase of building materials and land acquisitions - Not doing
9) Hire and supervise the activities of subcontractors and subordinate staff. - Not doing

Out of 9 duties I am exactly doing 4

Or is there any other NOC that match with my Job role Planning engineer

My current Duties and Responsibilities are

1)Plan and manage projects, and prepare material, cost and timing estimates, reports and Schedule specifications for Construction
2)Develop schedules and programs and provide guidance to Construction crews regarding the same
3)Tracking, Monitoring, analysing progress of work using primavera, MS Project etc
4)Analyses, evaluates, and forecasts progress and performance against an established baseline schedule using S curves and histograms
5) Developing Look ahead Schedules, earned value reports, manpower reports, weekly and monthly reports, as required by the Site Team.
6)Preparation of Project Cash flow/S curves & Histograms
7)Resource levelling & critical path analysis
8)Prepare and develop catch-up / recovery programme if required.
9)Analysing and approving subcontractor schedules
8)Conducting and participating in meetings (i.e. planning meeting, schedule review meeting, progress meeting, coordination meeting etc.)
 

sobhanisri

Newbie
Aug 29, 2020
2
0
Dear All,

My name is Steve. I studied mechanical engineering and currently working in saudi as planning Engineer. Now My migration agent told me that my NOC is 0711 Construction Manager. But I am not performing any managerial role in my company. So can I go ahead with Construction manager NOC - 0711. Is there any chances for PNP Nomination for this NOC. Please help me.

NOC 0711 Duties as per NOC list

1) Plan, organize, direct, control and evaluate construction projects from start to finish according to schedule, specifications and budget- Doing
2) Prepare and submit construction project budget estimates- Not Doing
3) Plan and prepare construction schedules and milestones and monitor progress against established schedules- Doing
4) Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors- Not Doing
5) Develop and implement quality control programs- Not Doing
6) Represent company on matters such as business services and union contracts negotiation- Doing
7) Prepare progress reports and issue progress schedules to clients - Doing
8) Direct the purchase of building materials and land acquisitions - Not doing
9) Hire and supervise the activities of subcontractors and subordinate staff. - Not doing

Out of 9 duties I am exactly doing 4

Or is there any other NOC that match with my Job role Planning engineer

My current Duties and Responsibilities are

1)Plan and manage projects, and prepare material, cost and timing estimates, reports and Schedule specifications for Construction
2)Develop schedules and programs and provide guidance to Construction crews regarding the same
3)Tracking, Monitoring, analysing progress of work using primavera, MS Project etc
4)Analyses, evaluates, and forecasts progress and performance against an established baseline schedule using S curves and histograms
5) Developing Look ahead Schedules, earned value reports, manpower reports, weekly and monthly reports, as required by the Site Team.
6)Preparation of Project Cash flow/S curves & Histograms
7)Resource levelling & critical path analysis
8)Prepare and develop catch-up / recovery programme if required.
9)Analysing and approving subcontractor schedules
8)Conducting and participating in meetings (i.e. planning meeting, schedule review meeting, progress meeting, coordination meeting etc.)
Hi Dear,
What NOC code finally you selected and what's your status on PR now?
regards,
Srichand
 

ramseriv

Star Member
Mar 20, 2021
67
10
Can a Civil Engineer apply under FSW and obtain PR even though he has not a licenced in Canada??

Also in the question of CRS: Level of education where does Civil Engineering falls? I am confused as civil engineering needs a licensed but is also a bach degree...
1. Bachelor degree (3 or more years program at a university)
2. Master OR professional degree needed to practice in a licensed profession?
 
  • Like
Reactions: daninmotion