It happened to me before and I had to delete an application and start over. Try that.TECC_Seneca said:The work permit tool is down for the last few days. What to do, I am running out of time ???
It happened to me before and I had to delete an application and start over. Try that.TECC_Seneca said:The work permit tool is down for the last few days. What to do, I am running out of time ???
Thanks I will try that. But is it wise to wait until March to apply for the work permit since I may get an update on my PR by then hopefully.ukaz007 said:It happened to me before and I had to delete an application and start over. Try that.
TECC_Seneca said:Hello All,
All the PGWP holders who applied for PR and are applying for the BOWP, can you please help me with these questions? What did you choose for these questions?
What would you like to do in Canada? ( I chose Work)
Work, Study, Move here
How long are you planning to stay in Canada? Temporarily less than 6 months, Temporarily more than 6 months, Permanently ( I chose Temporarily more than 6 months)
What is your current immigration status? Student, Worker, Temporary resident permit holder ( I chose Worker)
But I need to confirm if these are right answers. Cuz after I finished this questionaire, I was not asked to submit copy of AOR or the PR document checklist. I am really lost.
Appreciate any help. Thanks
Thank you so much for the prompt response. Also they ask for the document number of the work permit in the application. What is that?Sam6227 said:Hi TECC_Seneca,
1. What would you like to do in Canada?
Ans: should be work as you are applying for work permit.
2. How long are you planning to stay in Canada?
Ans: More than 6 months as BOWP is valid for 1 year.
3. What is your current immigration status?
Ans: Worker. As you are currently a holder of PGWP.
They will not ask for PR documents separately. Include a Letter under Additional documents explaining your situation mentioning your UCI number, DOB, PR application no. and AOR receive date. Subject of the letter should be 'Application for Bridge Work Permit'. Also attach your current PGWP (all in one PDF)
I am in the same situation as you are and applied for BOWP in December.
Hope this helps..
1. Document number is on the top right corner of your work permit, the number starts with an alphabet.TECC_Seneca said:Thank you so much for the prompt response. Also they ask for the document number of the work permit in the application. What is that?
And there is question asking about the start and end date of your current immigration status in canada. What dates do you provide here?
And the file size will be really big if I attach my document checklist for the PR. How did you do it? It doesn't allow anything more then 4 mb right? So attaching the entire doc checklist id going to make it a large large file. How does one tackle that? ???
Thanks a tonne!
Applied in december. My PGWP was expiring end of december (due to passport expiry). so I applied for both pgwp extension and bridge work permit. I did not attach PR document checklist, i dont think its mandatory, if it is then i didnt know about it when i applied :STECC_Seneca said:Thanks once again. Oh yes, I know the online reduction tools, but I am sure if I attach the PR document checklist, the size is going to be huge and I doubt any tool can reduce that.
And also I thought the document checklist is mandatory to send? No?
When did you submit your BOWP application? When is your permit ending? Mine is ending in May.
Thank you!
Thanks. Oh I see, so you got your BOWP or not yet?Sam6227 said:Applied in december. My PGWP was expiring end of december (due to passport expiry). so I applied for both pgwp extension and bridge work permit. I did not attach PR document checklist, i dont think its mandatory, if it is then i didnt know about it when i applied :S
You don't need the second AOR to apply for a BOWP. I mentioned the following link in my application just to be on safe side.tonero said:How long does the second AOR take i.e the one that shows the application has passed the R10 check. I need this asap as my wp expires in March
I got an AOR right when i submitted am i good to go with that application?