YEs, Although its cloudy and drizzling today but sun will shine.mtc1992 said:....is there?
YEs, Although its cloudy and drizzling today but sun will shine.mtc1992 said:....is there?
we have the same AOR, it's good there's movement in your app. I haven't had any since 25/2. Exactly two months todayHercaz said:CEC.
Its been a month since your GCMS notes were generated, hopefully the Security and Eligibility checks must be completed by now. For most of the pnp-o post 15th January - eAPR the Primary office seems to be CIC, hopefully they should issue PPR.Kar1205 said:Received my GCMS notes. It was ordered on 25th March and was generated on 27th.
AOR: 31st Jan
PNP-O
Med Passed: 03-March
BG : NA - Updated on 08 March
As per Notes:
My Medicals, R10 and Criminality - Reviewed and Passed.
A11.2 and Security - Not Started
Primary Office: Cnetralized Intake Office (CIO)
Secondary Office: CPC-Ottawa
And on Page 2: The Applicant Assignment Due Date has been mentioned as 07-April 2017.
Does it means that my A11.2 would have been initiated on this date?
Also, on Page 3: SECONDARY OFFICES has been mentioned.
Secondary Office: 1; OSC- Operations Support Center
Secondary Office: 2; CPC- Ottawa
Secondary Office: 3; CPC Vegreville
I am from INDIA and I was assuming that my local visa office will be NDVO. But I haven't see NDVO in this Secondary Office list
Won't my application will be forwarded to NDVO? Or Will it be done on later stage?
Any other Inputs will be of great help.
We all know for a fact that PNP applicants take longer than CEC, so the fact that you could have waited for another draw and didn't is your own fault. So keep the ranting to yourself as you only have yourself to blame,the only thing you can do is to sit tight and wait. Wish you all the best.SFKAS said:Disclaimer: This is going to be rant. I am going to whine
What is going on with PNP. I am not even sure if I am inland or outland. I applied from within Canada and then left Canada. Changed my country of residence and address. So what does that make me?
Besides why is there such a discrepancy between PNP and other classes specifically CEC. Had I waited one more draw I would have been qualified under CEC. Obviously easier said in hindsight.
Again thats besides the point. Why are they delaying PNP so much. Why? Just fail to understand. Its been a long journey, longer than most which I won't get in to right now. This wait is just messing me up in every which way. I know other PNPs are in the same boat.
Mind you even if this passes 6 months we can't do nothing. God forbid it does.
Its become extremely difficult to deal with this even though there is NO other choice.
There is a specific thread for copr processing time for each month,check Passport to Ottawa April thread,based on what ive seen for cec,it takes about a week.gagandesires said:Hey Guys, how long does it take after the PPR step? I've sent my passport on Thursday and it was received on Friday in Ottawa. When can I expect CoPR?
Thanks.
Alright. Thank you.sby123 said:There is a specific thread for copr processing time for each month,check Passport to Ottawa April thread,based on what ive seen for cec,it takes about a week.
yes, it is manual around 98% of the times.zfx610 said:How do you guys know when the status changes, like BG from IP1 to NA to IP2? :-[
Do you check it manually everyday or they will send you email notification? :-X
The only email I got is when I passed Med Test. :-\
Received my GCMS notes today. The last update was on Feb 25!! (jess!).. it says, R10 passed. Schedule A received and reviewed. see edoc xxxvishalg said:yes, it is manual around 98% of the times.
How long did it take you to get the GCMS note?taffarel said:Received my GCMS notes today. The last update was on Feb 25!! (jess!).. it says, R10 passed. Schedule A received and reviewed. see edoc xxx
That due date means nothing particular. It is just somebody has to check the application and if they are still waiting for womething just postpone that date for laterKar1205 said:Received my GCMS notes. It was ordered on 25th March and was generated on 27th.
AOR: 31st Jan
PNP-O
Med Passed: 03-March
BG : NA - Updated on 08 March
As per Notes:
My Medicals, R10 and Criminality - Reviewed and Passed.
A11.2 and Security - Not Started
Primary Office: Cnetralized Intake Office (CIO)
Secondary Office: CPC-Ottawa
And on Page 2: The Applicant Assignment Due Date has been mentioned as 07-April 2017.
Does it means that my A11.2 would have been initiated on this date?
Also, on Page 3: SECONDARY OFFICES has been mentioned.
Secondary Office: 1; OSC- Operations Support Center
Secondary Office: 2; CPC- Ottawa
Secondary Office: 3; CPC Vegreville
I am from INDIA and I was assuming that my local visa office will be NDVO. But I haven't see NDVO in this Secondary Office list
Won't my application will be forwarded to NDVO? Or Will it be done on later stage?
Any other Inputs will be of great help.