Hi,All!
Thanks for sharing your thoughts and timeline.
I would like to share too mine was very slow:
1. BC PNP applied in September 2018 nominated March 2019
2.applied paper based PNP-april 10th 2019
3. IRCC received and started process24 may2019
4.medical request september 2019
5.medical passed october 31st 2019
6.1november 2019 request additional documents
6.2 november(29th)2019 pre-arrival letter
7. additional documents sent in december 2019
No news since then
8. today 24th of september by BC time but in the letter 23rd of september final desition made.
Hopefully rest going to be easy
Thanks for sharing your thoughts and timeline.
I would like to share too mine was very slow:
1. BC PNP applied in September 2018 nominated March 2019
2.applied paper based PNP-april 10th 2019
3. IRCC received and started process24 may2019
4.medical request september 2019
5.medical passed october 31st 2019
6.1november 2019 request additional documents
6.2 november(29th)2019 pre-arrival letter
7. additional documents sent in december 2019
No news since then
8. today 24th of september by BC time but in the letter 23rd of september final desition made.
Hopefully rest going to be easy