Hello All,
I have an experience letter from my employer but i found that the roles and responsibilities are not matching exactly the NOC 2141. I am writing down the one's that are in NOC 2141 and that are on my experience letter. My position is Quality Control Engineer. Please help and suggest
NOC 2141 ROLES AND REPONSIBILITIES
Also, I worked 10 months for one employer and one year for the other employer and now it's my third job that I got recently. My PR application is under progress but not sent yet as I am waiting for PCC. I still have 45 days left to submit the application. Can i submit now without submitting the PCC as i will explain the state in a Letter of explanation or should i wait for it's arrival. I am also writing to know if I need the same experience letter as I have for the first two positions even though I am not getting any points for this new job. I have an offer letter but there are no roles and responsibilities indicated in the letter.
I have an experience letter from my employer but i found that the roles and responsibilities are not matching exactly the NOC 2141. I am writing down the one's that are in NOC 2141 and that are on my experience letter. My position is Quality Control Engineer. Please help and suggest
NOC 2141 ROLES AND REPONSIBILITIES
- Plan and design plant layouts and facilities
- Study new machinery and facilities and recommend or select efficient combinations
- Develop flexible or integrated manufacturing systems and procedures
- Conduct studies and implement programs to determine optimum inventory levels for production and to allow optimum utilization of machinery, materials and resources
- Analyze costs of production
- Design, develop and conduct time studies and work simplification programs
- Determine human resource and skill requirements and develop training programs
- Develop performance standards, evaluation systems and wage and incentive programs
- Conduct studies of the reliability and performance of plant facilities and production or administrative systems
- Develop maintenance standards, schedules and programs
- Establish programs and conduct studies to enhance industrial health and safety or to identify and correct fire and other hazards
- Evaluate or assess industrial facilities
- Supervise technicians, technologists, analysts, administrative staff and other engineers.
- Apply technical knowledge to inspect, analyze and solve quality issues related to polymers
- Supported sales and technical service to solve customer complaints, including decision- making and
- Troubleshooting
- Assists in identifying the root cause of a problem and instituting corrective actions, as well as
- verifying effectiveness
- Maintained ISO quality standards while working with mechanical equipment’s for polymer
- testing
- Prepare and Present production & downtime reports, receiving records, graphical representation and power point presentations
- Conduct studies and implement programs to determine optimum inventory levels for
- production and to allow optimum utilization of machinery, materials and resources
- Study new machinery and facilities and recommend or select efficient combinations
- Supervise the Quality control lab Staff
- Establish program and conduct studies to enhance industrial health and safety or to identify and correct
- fire and other hazards
- Ensure that all aspects are in full compliance with the quality system in place at the operation at all the times
- Follow safety rule 100% of the time and ensure that all procedures under ASTM are being followed
- Work on Epicor (ERP) and Excel all the times for better control of all the business processes
- Coordinate and conduct supplier quality activities. Ensure they meet company quality standards
- Collect/analyze statistical data, failures, corrective and preventative actions to ensure compliance,
- improve quality and respond to customer issues
- Ensures there are no interruptions or errors due to lack of giving or seeking information by fully informing the group leaders of all the events Affecting plant operations
- Observe and monitor product and equipments to ensure conformance to specifications and make or order necessary process or assembly adjustments
- Discard or reject products, materials, and equipment not meeting specifications
- Discuss inspection results with engineering manager and recommend necessary corrective actions
- Develop work Quality standards
- Participate in product research and development
Also, I worked 10 months for one employer and one year for the other employer and now it's my third job that I got recently. My PR application is under progress but not sent yet as I am waiting for PCC. I still have 45 days left to submit the application. Can i submit now without submitting the PCC as i will explain the state in a Letter of explanation or should i wait for it's arrival. I am also writing to know if I need the same experience letter as I have for the first two positions even though I am not getting any points for this new job. I have an offer letter but there are no roles and responsibilities indicated in the letter.