+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
I received a mail that there was a msg in my GCKey account when I checked it ....i got pa nd in the evng when I checked my ecas it showed decision made
Glad to hear that Sandhu
 
  • Like
Reactions: 1506
1 thing is clear that MOST updates on GCkey of NDVO were done on SUNDAYs , may be guys working nights or having diff days OFF , same like in Canada some shift workers do!
 
Thanks, I know INDO but there are Pb. Roadways and many PEPSU times going directly from airport. May like to read this link Jessy:-
https://www.tribuneindia.com/news/ludhiana/volvo-bus-service-to-igi-airport-launched/630654.html

And ticket is 1/2 price of the INDO CDN but I did not travel by Roadways. they have a boarding point right there if you try to do a dummy booking.
I know Haryana roadways is good and it doesn’t start from T1 or T3 so you will have to take free shuttle bus from either of terminal to public transport centre near centaur hotel .takes about 10-15 mins and froM there you can board onto one of these Volvo buses but downside is if your are travelling with lot of luggage it can be hard to load and unload from shuttle plus if it’s a female passenger at late night I would suggest rather prefer indo Canadian since there are loads of other passengers travelling from airport and you take it right from outside the terminal
Hope this helps
 
  • Like
Reactions: singleman
I know Haryana roadways is good and it doesn’t start from T1 or T3 so you will have to take free shuttle bus from either of terminal to public transport centre near centaur hotel .takes about 10-15 mins and froM there you can board onto one of these Volvo buses but downside is if your are travelling with lot of luggage it can be hard to load and unload from shuttle plus if it’s a female passenger at late night I would suggest rather prefer indo Canadian since there are loads of other passengers travelling from airport and you take it right from outside the terminal
Hope this helps
Very good advice. Thanks I agree.
 
  • Like
Reactions: neha25
Application applied on 1st june 2018
Med requested on 23 july
Med passed 29 july
File transferred to NDVO 6 aug
Processing started 16 aug
After that it shows in process
Looking at above my answer is the same as before. Wish u best of luck dear
Single-Uncle
 
  • Like
Reactions: Nidhisodhi