Finally,
P1: September 4th
P2: October 15th !!!!
long wait with a messy process at IRCC side.
I hope this long wait ends by a initiating eCOPR quickly
P1: September 4th
P2: October 15th !!!!
long wait with a messy process at IRCC side.
I hope this long wait ends by a initiating eCOPR quickly