Hello,
I completed landing on April 8th 2017 at Rainbow bridge Niagara. Today I had called up cic to check the status of my PR card and I was told that it was sent to production on May 23rd.
Does anybody here know the approximate wait time to receive the PR card ?
thanks
I completed landing on April 8th 2017 at Rainbow bridge Niagara. Today I had called up cic to check the status of my PR card and I was told that it was sent to production on May 23rd.
Does anybody here know the approximate wait time to receive the PR card ?
thanks