I have worked in the position of project coordinator in a mechanical contractor company,
My job duty are the following:
- Preparing Take off and submit the final counts of associated material or equipment to project manager for approval (requisition of supplies and material).
- Plumbing and piping take off from mechanical drawings.
- Coordinate with project team, general contractor, sub-trades on RFI’s, Site Instructions and information Bulletins and keep track them.
- Review shop drawings as per specification and submit to general contractor or engineer for approval.
- Coordinate with suppliers or sub-trades on equipment deliveries, shop drawings and operation manuals.
- Prepared and submitted all the close-out documents such as warranty letter, sprinkler letter, O&M manuals and as-built drawings.
- Price scope changes, change orders and work orders as required, Track & manage contemplated change notices and change orders in the database.
which noc code can i use? should we must have a noc code for each job we have worked?
please help me out.
I am sending out my application this week.
thanks guys.!!
I have worked in the position of project coordinator in a mechanical contractor company,
My job duty are the following:
- Preparing Take off and submit the final counts of associated material or equipment to project manager for approval (requisition of supplies and material).
- Plumbing and piping take off from mechanical drawings.
- Coordinate with project team, general contractor, sub-trades on RFI’s, Site Instructions and information Bulletins and keep track them.
- Review shop drawings as per specification and submit to general contractor or engineer for approval.
- Coordinate with suppliers or sub-trades on equipment deliveries, shop drawings and operation manuals.
- Prepared and submitted all the close-out documents such as warranty letter, sprinkler letter, O&M manuals and as-built drawings.
- Price scope changes, change orders and work orders as required, Track & manage contemplated change notices and change orders in the database.
which noc code can i use? should we must have a noc code for each job we have worked?