+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445

NOC 2171 - Business Systems Analyst. Is the NOC 2171 acceptable?

dauntless84

Hero Member
Sep 25, 2017
244
38
Hello guys,

I need your thoughts on this since I am applying for EE. I'm a Business Systems Analyst. Is the NOC 2171 acceptable for NOC 2171 as a Business Systems Analyst?

Below are the duties
As a Business Systems Analyst, perform the following duties for 40 hours per week:

- Perform systems requirement gathering, analysis and specification, designing, developing, testing, configuring and implementation of the system based on project requirements.

- Defines and documents project based functions, analyze business requirements and processes.

- Consults with functional unit management and personnel to identify, define and document business needs and objectives, current project operational procedures, problems, input and output requirements, and levels of systems access.

- Acts as a liaison between departmental end-users, technical analysts, information technology analysts, consultants and other governmental organizations in the analysis, design, configuration, testing and maintenance of case management systems to ensure optimal operational performance in the project.

- Analyzes the feasibility of, and develops requirements for new systems and enhancements to existing systems; ensures the system design fits the needs of the users.

- Tracks and fully documents project lifecycle and changes for functional and business specifications; writes detailed universally understood procedures for permanent records and for use in training.

- Identifies opportunities for improving business processes through information systems and/or non-system driver changes; assists in the preparation of proposals to develop new systems and/or operational changes.

-Reads and interprets case management systems and functional technical literature and translates in terms understandable to the end-users.

- Plans, organize and conduct business process reengineering/improvement projects and/or management reviews of court-wide significant or specific to a court division. {Examples are projects requiring strategic analysis of an entire process or operating area where specific issues or items to be corrected, examined or recommended have not been identified. Recommended solutions should be developed in consultation with impacted internal and external stakeholders, but should remain objective and independent of the specific stakeholders.)

- Researches and prepares statistical reports using data from court computer systems and internal surveys. Consolidates information into cohesive and understandable correspondence or other written form for use in management decision-making.


Look forward to hear from you.

Dan