Hi,
I need some experts advise.
I am on PGWP and that expires in 4 months. I have Ontario PNP certificate and applied for Federal PR through paper based.
I dropped my wife's spouse dependent work permit 3 weeks back. It takes 10 weeks to process the file as per the current processing times. I have a feeling that her visa will get rejected as I have less than 6 months work visa. I wrote a letter of explanation that I have PNP and applied for PR, I am eligible to apply for BOWP to extend my stay.
After getting work permit extension, Can I apply online for the visitor visa and run 2 applications parallelly?
Based on the current application she will get the result after 2 months. I am trying to run the parallel application so if she gets rejected the paper based, she might get online approved (in the same time) as my visa expires > 6 months.
Any advice is appreciated.
Thanks.
I need some experts advise.
I am on PGWP and that expires in 4 months. I have Ontario PNP certificate and applied for Federal PR through paper based.
I dropped my wife's spouse dependent work permit 3 weeks back. It takes 10 weeks to process the file as per the current processing times. I have a feeling that her visa will get rejected as I have less than 6 months work visa. I wrote a letter of explanation that I have PNP and applied for PR, I am eligible to apply for BOWP to extend my stay.
After getting work permit extension, Can I apply online for the visitor visa and run 2 applications parallelly?
Based on the current application she will get the result after 2 months. I am trying to run the parallel application so if she gets rejected the paper based, she might get online approved (in the same time) as my visa expires > 6 months.
Any advice is appreciated.
Thanks.