Hi!
I was accepted sep 30th in MEng Electrical, Winter 2017, with the status "accepted final". I received an email a couple days later with my LOA, with lots of information. I requested "deferral" to begin in Summer 2017, because the VISA processing time for Brazil is too long. It was accepted...