+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445

>>>>>> 2021 TR to PR Pathway AOR & Timelines <<<<<< Join here

anandniv

Newbie
Mar 9, 2022
1
0
I received my TFN (XE0027*****) on February 23rd and was able to link my application this morning. I desperately need your advice.
I moved to Canada when I was 18 years and 5 months old, so thought I don't need an Indian PCC. I found out today that I need to submit an Indian PCC, and the BLS website states that the minimum required time is 8 weeks. So, what should I do if I receive a PCC request from IRCC?
 

Jas_K

Full Member
Jun 21, 2021
49
20
Hi,
Just want to confirm from those who got AOR.
As such i haven’t received any confirmation from IRCC but just got email to link my application nothing else after this. I belong to
Series 0023.
 

Pallav Shukla

Member
Jan 1, 2022
14
7
There are some people here saying that they called IRCC and agent told them stuff about their application..I am just wondering by which way you guys are able to get to talk with agent? I am calling IRCc from last two months...not getting through..any suggestions?
 

SmzAmir

Hero Member
Oct 24, 2021
705
724
Hi,
Just want to confirm from those who got AOR.
As such i haven’t received any confirmation from IRCC but just got email to link my application nothing else after this. I belong to
Series 0023.
The email that you got with the application number is the AOR and they are working on your application right now.
 
  • Like
Reactions: Jas_K

yoomi0516

Star Member
Sep 13, 2021
134
54
I got the GCM's note.
Would you mind advising me on the note below?

'Please, contact MHB-Ottawa to have the medical reassessed. (DEP CHILD) Medical exam expire 2021/06/24
Verification line created as request letter has been sent. The line is to be canceled upon receipt of documents.'

What does that mean?
Also, besides her status : Medical: Passed -expired"

Do I need to send the dependent's new medical exam?
 

Troponin

Full Member
Nov 15, 2019
29
9
Whenever someone sends a webform.
It directly goes to your file. That's why we insert application number while filling up the Webform.

but when visa officer actually opens the file then applicants gets notified that "we received your document".
I hope that's help.
Thank you so much!
 

@aman se t g se

Full Member
Oct 30, 2019
46
6
I received my TFN (XE0027*****) on February 23rd and was able to link my application this morning. I desperately need your advice.
I moved to Canada when I was 18 years and 5 months old, so thought I don't need an Indian PCC. I found out today that I need to submit an Indian PCC, and the BLS website states that the minimum required time is 8 weeks. So, what should I do if I receive a PCC request from IRCC?
When did you submitted your application?
 

Twic3born

Full Member
Jan 19, 2022
23
15
Aor 19th jan
Adr for PCC and Ielts -20th jan submitted same day
Send webform for missing refusal with New IMM5669 form
Adr gone into reviewing on 28th Feb
Webform accepted on 1st march
GU -8th march

how long more is gonna take for portal request???
Thanks
 
  • Like
Reactions: TheFoxTrail

zainmalik

Newbie
Mar 8, 2022
5
0
I was exactly in the same situation. I raised a webform notifying IRCC about the change in my family composition (addition of outland spouse). I am copy-pasting the response I got from the visa officer:

"If you are the principal applicant of a permanent residence application already in process, you could add your spouse or common-law partner, dependent children, and their dependent children to your application, even if they were listed as a non-accompanying dependent in the initial application.

To do so, we invite you to send your add-on request through the IRCC webform available on our website. You can attach the following forms and documents in the field reserved to that effect:

A new Generic Application Form for Canada (IMM 0008) with supporting documents,
(If applicable) A Schedule A - Background/Declaration (IMM 5669) form,
(If applicable) An Additional Dependants/Declaration (IMM 0008DEP) form,
(If applicable) A signed Additional Family Information (IMM 5406) form,
A copy of the birth certificate, marriage certificate or proof of common-law relationship,
A copy of the family member's valid passport,
Police certificates for all countries where the family member over the age of 18 has lived for more than 6 months since turning 18,
A letter of explanation, and
If applicable, the proof of payment."


I hope this helps! Good luck.
Thank you so much for this response. Can I know if the webform should be raised after getting the AOR or can be raised before as well?
 

zainmalik

Newbie
Mar 8, 2022
5
0
You need to raise a webform and notify the IRCC about the change.
Also, you need to send the following documents for your spouse in the webform:
- imm5406
- imm5669,
- imm5562
- birth certificate (with official translation if required)
- passport,
- marriage certificate,
- PCC,
- evidence of relationship (explanation + photos).

And for you a new:
- imm5406
- imm0008
- imm5562 (if you travel out of Canada for marriage or new travel since your submission)

If the file size limit is reached, split the files over multiple webforms. Just remember that you need to print imm5669 for both of you and sign it by hand and scan it again for upload.
Thank you so much for this response. Will help me a lot. Should I raise the webform after getting the AOR or it can be raised right away?
 

sharma.a

Star Member
Mar 7, 2022
78
63
Thank you so much for this response. Can I know if the webform should be raised after getting the AOR or can be raised before as well?
I am not an expert on this topic. However, based on my limited knowledge, I believe, you will need an Application No. while raising a webform. However, what you can do is, already prepare all the documents that you will need. As soon as you receive the AOR, you can raise a webform right away and attach all the requested documents.
 
  • Like
Reactions: Rebecca Li

sharma.a

Star Member
Mar 7, 2022
78
63
Aor 19th jan
Adr for PCC and Ielts -20th jan submitted same day
Send webform for missing refusal with New IMM5669 form
Adr gone into reviewing on 28th Feb
Webform accepted on 1st march
GU -8th march

how long more is gonna take for portal request???
Thanks
Hey, thanks for sharing your timeline.

How did you figure out that your ADR went into reviewing on 28th Feb and the webform was accepted on 1st March?

Did you get any sort of updates in your account or did you receive an email stating something on the lines of "We are pleased to confirm reception of the document(s). We have forwarded them to the responsible office for their consideration."?

I am asking this because I received such a confirmation yesterday, and just trying to assess in how much time should I expect a GU.

Thanks!